Scope:

Technical Assistance

Client:

Cleveland Bridge UK

Completion:

2016

Cost:

Stg1.6b

 

The Forth Replacement Crossing is a cable-stayed bridge which was to be constructed to the west of the existing Forth Road Bridge.  The project is part of a package of transport improvements costing £1.45 to £1.6 billion and is on track to be delivered in 2016.  The largest civil engineering project in Scotland for a generation, it will replace the current Forth Road Bridge as the main vehicle crossing of the Forth.

ClearTech Engineered Solutions scope is to provide technical assistance, at Project Director level, to Cleveland Bridge UK, working with the international consortium consisting of Hochtief Solutions, American Bridge, Dragados and Morrison Construction.

prev next
  • Forth River Crossing, Edinburgh, Scotland
  • Forth River Crossing, Edinburgh, Scotland
  • Forth River Crossing, Edinburgh, Scotland
  • Forth River Crossing, Edinburgh, Scotland
  • Forth River Crossing, Edinburgh, Scotland
  • Forth River Crossing, Edinburgh, Scotland
 
 
 
 
 
 

Value Engineering | Post Tensioning Design | Tender Support | Design & Technical Assistance | Jacking, Repairs & Strengthening  |  Temporary Works