Client:

PJ Hegarty

Scope:

Design, Supply & Installation of Post-Tensioning

Completion:

2020

 

Spencer Place Development  consists of 3 buildings over a common 3 story basement, with 212-bed hotel, restaurants, retail units and 46,184sq m of LEED platinum-rated office accommodations. 

The development is located in the Dockland Development zone in Dublin Port  and consists of 66,599sq m of space, spanning over 7 floors with a 11m wide glazed atrium. 


ClearTech’s scope covered the design, supply and installation of post tensioning. A complex project due to the inclusion of a 13 meter cantilever  from the 2ndfloor upwards. ClearTech developed a cost effective design by including Post-Tensioning beams which helped to eliminate the cost on steel beams, saving the client significant costs.

 
prev next
 
 

Carbon Fibre solution was installed by ClearTech at Spencer Place, Dublin.

 
 
 
 
 

Value Engineering | Post Tensioning | Project Support | Technical Assistance | Repairs & Jacking | Tender Support  |  Smart Solutions