Client:

Sisk

Scope:

Design, Supply & Installation of Post-Tensioning

Completion:

2020

 

Fibonacci Square is the redevelopment of the AIB Bankcentre site in Ballsbridge, Dublin 4 to create Facebook’s European HQ Campus. 

 The development includes the demolition of 4 no. office blocks and the development of 2 no. 6 storey office buildings (with setback on 4th and 5th Floor) over three levels of basement.

The structure of the buildings is reinforced concrete with post tensioned floor slabs that have allowed spans of 12 metres of open plan space to be achieved whilst reducing the slab depth and the overall weight of the entire building.  

The building is set to achieve a LEED Gold Rating.

ClearTech’s scope covers the design, supply and installation of post tensioning of the floor slabs.

 