Following subsidence in the control building in the Dublin Airport Authoriy water reservoir, John Paul Construction had to underpin the structure and jack the roof of the building.
ClearTech provided an alternative design for the roof jacking using a ten point lifting fully computerised monitoring system. The jacking process was successfully carried out under strick specification and operating conditions as set out by the DAA.