Scope:

Temporary Works

Client:

Leighton Asia

Completion:

2015

Cost:

USD201m

 

The project consisted of the construction of 1498 AASHTO beam using precast moulds in a purpose built casting yard. The yard required up to 12 moulds. The casting yard was based in a disused rail maintenance facility and has been laid out as a combined batching plant casting area and storage area.

ClearTech designed the casting yard for Leighton Construction Asia.  The main challenges in this project related to the ground conditions at the casting yard and flooding in the area.

ClearTech designed the Gantry Rail as a continuous elastic beam, developing up ground improvement solution that reduced deflections on the beam, over the period of the project to +/- 5mm.

 
prev next
  • NLEX Northern Tollway, Manila, Philippines
  • NLEX Northern Tollway, Manila, Philippines
  • NLEX Northern Tollway, Manila, Philippines
  • NLEX Northern Tollway, Manila, Philippines
  • NLEX Northern Tollway, Manila, Philippines
  • NLEX Northern Tollway, Manila, Philippines
  • NLEX Northern Tollway, Manila, Philippines
  • NLEX Northern Tollway, Manila, Philippines
  • NLEX Northern Tollway, Manila, Philippines
  • NLEX Northern Tollway, Manila, Philippines
  • NLEX Northern Tollway, Manila, Philippines
 
 
 
 
 
 

Value Engineering | Post Tensioning Design | Tender Support | Design & Technical Assistance | Jacking, Repairs & Strengthening  |  Temporary Works