Redevelopment of the Lab in Abbvie Sligo, where ClearTech designed and installed specialist flat-jacking to support the overhead floor to facilitate the works in the lab.
ClearTech installed 25t flat jacks and transfused specialist micro-grout, thereby keeping a continuous load in the steel frame.
ClearTech continuously monitored the loads and the movements of the floor above during all stages of the operation.